In the USA the most popular of geothermal energy is the use of heat pumps. Geothermal is essentially extracting using air pumped through pipes in the earth. For heat pumps or heat exchange systems these can be as little as 6 feet under the earth’s surface. When used to generate electricity they are typically over 1,500 feet into the earth. The reason for heat pumps to so shallow is that the air temperature just a few feet below the surface typically stays in tight temperature range between 50F and 60 F or 10C and 16 C. This is very similar to why caves are always so cold. When used to generate electricity the deeper distance have a much hotter temperature.
A blog that provides info on environmental current events, DIY home projects, and much more. We will also investigate into how renewable energy, energy consumption impact and are affected US policy and World Wide.
Showing posts with label geothermal. Show all posts
Showing posts with label geothermal. Show all posts
Monday, August 8, 2011
Wednesday, August 3, 2011
Geothermal Power Plants May See Some Relief From Legislation
Good news for the geothermal industry in two bills that may ease regulations. Currently the amount of projects started in the USA has stagnated. This is due to two main reasons; the long permitting process and the cost of test drilling. Slowly these two items might be alleviated for the industry as legislation seems to be moving forward. A lot of geothermal projects take 4-8 years to come on line between permitting, test drills and other factors. Limiting any of these delays could spur more development as companies stand to lose less time and money on a given project. Currently the permitting process for each test well may be 15 months, if it takes multiple tests to get a well up and running the time between conception and production can be too long to bear for most companies.
Subscribe to:
Posts (Atom)